Design, Supply and Installation of Steelwork and Cladding at City Waste Recycling.

Steelwork and Cladding

Project description

Portal frame building with 12m wide doors to enable easily access/egress.

  • Feasibility studies
  • Value Engineering
  • Setting out site with Total Station
  • Construction supervision
  • 3D Drawing Package
  • Erection of Steel Frame
  • Installation of Cladding

 

Client

City Waste Ltd

 

Year

2009

 

Project budget

£ 300k

 

More images of this project

Health Trust

Value Engineering, Detailing, Fabricating and Installation of Steelwork and Metalwork for 3 New Health Centres.

  • Holywood Arches CCTC
  • Lisburn Road CCTC
  • Castlereagh CCTC

 

Client

Farrans Construction

 

Year

2007

 

Project budget

£ 2.4 million

 

Other projects at a glance

2010 Lisburn College -                           1.1M

2009 Knockbracken Health Centre -       540K

2008 Extension of Lagen Cement Mill -  1.2M

2007 Hyster - Crane/ Crane Rails -        340K

2006 Belfast International Airport -        320K

2005 Belfast International Airport -        520K